🔄 Draft, Submit, Review & Revision
Level: Intermediate
⏱️ Estimated: 8 Minutes
Module: FARM
Survey Lifecycle: Draft, Submission, Review, and Revision Follow-up
Understanding survey lifecycle statuses, pre-submission QA thresholds, and procedures for addressing returned revisions.
Target Roles:
SURVEY USER, ADMIN, SUPER ADMIN
Log In to Track Learning Progress
📋 Prerequisites Before Starting
Form 1 and Form 2 fully filled with at least one observation unit.
Survey Status Workflow Diagram
Every survey on the APRA platform progresses through this lifecycle:
[DRAFT] → (Complete QA Validation) → [SUBMITTED] → (Reviewer Evaluation)
↓ ↓
[RETURNED TO DRAFT] [REVIEWED / APPROVED]
(Needs Revision + Notes) (Locked & Finalized)
Submitting Surveys for QA Review
- Open your farm draft detail page.
- Verify that all plastic items have been cataloged and each observation unit has at least one photo.
- Check the QA Readiness Indicator banner at the top of the form. When it reaches 100%, submission is unlocked.
- Click Submit for Review.
- The survey status transitions to
submittedand enters the Reviewer workspace queue.
Handling Surveys Returned for Revision
- If a reviewer identifies data discrepancies, the status is reverted to
draft. - Open the survey and inspect the Reviewer Correction Notes in the amber banner.
- Revise requested items (e.g., unclear photo, misaligned coordinates, or implausible sack weights).
- Once corrected, click Submit for Review again.
🎯 Expected Results
Survey successfully submitted to the review queue and revised if reviewer feedback is issued.
⚠️ Common Pitfalls & Troubleshooting
Attempting to edit submitted or reviewed surveys. Forms are locked automatically to maintain quality control integrity.
🔒 Security & Data Privacy Notice
Reviewer feedback comments are logged in audit trails and accessible by the survey owner.
💬 Was this Guide Helpful?
Your feedback helps us continuously improve technical APRA survey instructions.
Current Category
🔄 Draft, Submit, Review & Revision
Survey lifecycle: saving drafts, QA validation, submission, reviewer evaluation, and revision follow-up.
View all guides in this category →
Related Guides
- Creating and Managing Farm Location Profiles (Form 1) ⏱️ 8 mins • Intermediate
- Inputting Plastic Flow Items and Allocating 11 End-of-Life Fates ⏱️ 10 mins • Intermediate
🔬 Using Demo Data?
Simulated data (such as
DEMO-01) is provided out-of-the-box for independent training. You can freely test without affecting real survey records.